For this project of bathroom renovation in Hua Hin, we completely removed tiles, prior bathroom appliances and plumbing and built an entirely new bathroom as per client's requirements. This extensive project was completed in 1 month.
For this project, the client asked us to renovate a 4x10 m swimming pool in Hua Hin. After polishing stones we applied coating for an outstanding finishing. The project was completed in 4 days.
For this project, our client asked us to recommend suitable design and material for a new garden fence in a residential project in Hua Hin. Our team completed the fit-in in one day much to client satisfaction.
For this project, the challenge was in renovating a bathroom in a 20 years old condominium project in Hua Hin. Our team removed all existing components and selected the new design and appliances with the client. This renovation work was completed in 3 weeks.
To provide additional protection from tropical rain, the client asked us to build a roof extension using polycarbonate material. The project was finished in one week.
The client asled us to upgrade his metal roof and replace it by PU foam material for improved insulation. The project located in Hua Hin took 2 weeks to complete.
The Client asked us to build a car port to protect two cars from rain and sunshine. Our team itegrated the car port design with the style of the house and built it from foundations to the roof in about 2 months and a half.
Due to Hua Hin proximity to the sea, buildings tend to need ceiling replacement . The client asked us to replace ceiling by new one and the project took 3 weeks to complete.
For this project our floor team renovated about 30 spm2 of woorden floor of this house by sanding and coating. The project took 5 days to be completed.
Most villas in Hua Hin boost swimming pools which need to be carefully built with solid foundations that can last overtime. Our team has strong expertise in building swimming pools that can last over time. Typically a swimming project will take about 2 months and a half.
Prior to construction work, demolition may be required. That is the task of our demolition team. This project in Hua Hin consisted in removing wall partitions to create a larger living room.